Osmo Post Fix
super strong alternative to concrete
does not rot timber like concrete can especially suited to Cedar
- Dig hole with Auger or hole diger
- Hole to be 24" deep for a regular 6ft post
- Ensure hole remains dry
- Position post in middle of hole and level then use temparory stakes to hold in position
- Mix Osmo post fix parts A and B into larger of the two bottles
- Screw on lid and shake for 20 seconds
- Remove lid and pour liquid all around post
- Sets solid in 3 minutes
- Once fully cured trim of excess from top and finish with soil if needed.